Replace Pool Deck at Battle Drive Pool
Fort Lee JOC
$291,095.39
Contract Number W911SF-14-D-0010 TO 0020
This project included the removal of the rubber mats from the pool deck and replacing the deck with new concrete with a slope to the existing drains. The new concrete is 4” thick and the existing materials were regraded, and additional depth of stone was provided to bring new surfaces to grade. Leebcor Services tried to construct new concrete surfaces as ADA as possible.