Latrine Addition TA-19

Fort Lee JOC
$282,354.56
Contract Number W911SF-14-D-0010 TO 0039
This project included structural and architectural design packages for the addition, a foundation, plumbing, HVAC, electrical, FA/MNS, and a lightning protectant. Additionally, a PE sealed foundation of approximately 20’x23’ with floor drains. The drainage system was reworked to align with the construction of the new addition.