Building 6008 Field House, Install Athletic Flooring
Fort Lee JOC
$179,197.51
Contract Number W911SF-14-D-0010 TO 0036
This project is comprised of two phases: installing 24,000-square-foot flooring with 24”x24” 8mm thick rubber tile matting, as well as the installation of 3,000-square-foot of synthetic turf. This excluded the rubber transition that was surrounding the basketball court; the basketball court area rubber was installed across the blue matting to protect the wood floor that was previously underneath.