Construct Pool Bath House

Fort Lee JOC
$405,769.68
Contract Number W911SF-14-D-0010 TO 0035
This task order included a structural and architectural design package for a new bath house, a foundation design, engineered truss package for the new bath house and the pump house, plumbing design, HVAC design, electrical design, and lighting protection.